These are drawings and written specifications prepared and assembled by architects and engineers for communicating the design of the project and administering the construction contract:

A. construction documents
B. bidding requirements
C. contract documents
D. all of the above
E. none of the above


Answer: A

Trades & Technology

You might also like to view...

An example of a contact poison is _____

A) Orthene B) Methyl bromide C) Rotenone D) Malathion

Trades & Technology

Costs associated with the manufacture of miniature high-sensitivity piezoresistive pressure transducers is, $73,000 per year. A clever industrial engineer found that by spending $16,000 now to reconfigure the production line and reprogram two of the robotic arms, the cost will go down to $58,000 next year and $52,000 in years 2 through 5. Using an interest rate of 10% per year, determine the present worth of the savings due to the reconfiguration. (Hint: Include the reconfiguration cost.)

What will be an ideal response?

Trades & Technology

The term bent or bend refers to metal being formed using a stake, brake, folder, die, roller, or similar tools.

Answer the following statement true (T) or false (F)

Trades & Technology

Technician A says the spark plugs are in the secondary ignition circuit. Technician B says the ignition module is part of the secondary ignition circuit. Who is correct?

A. A only B. B only C. both A and B D. neither A nor B

Trades & Technology