Using sketches and notes, explain how to distinguish graphically between framing lumber and finished lumber in cross-sectional drawings.
What will be an ideal response?
See the Instructor's Manual (IM).
Trades & Technology
You might also like to view...
3 ft. = 7.62 cm?
Answer the following statement true (T) or false (F)
Trades & Technology
The surety bonds used in a typical construction contract are
A) bid bond, performance bond, and payment bond. B) prescreening bond, award bond, and completion bond. C) bid bond, performance bond, and completion bond. D) bid bond, contract award bond, and completion bond. E) none of the above.
Trades & Technology
En recorridos verticales cortos, los cables son soportados generalmente por:
a. una placa de suspensión. b. una placa bajante. c. el codo vertical elevador. d. un sistema de soporte de refuerzo con alambre.
Trades & Technology
Merle coloring in dogs results from a recessive gene
A. True B. False
Trades & Technology