The civil engineer's scales are calibrated in multiples of ten.
Answer the following statement true (T) or false (F)
True
You might also like to view...
The anchorage of the bottom track of a load-bearing CFS wall to the concrete footing
A) requires 6-in.-long additional track material to strengthen the connection. B) requires a 6-in.-long cold-formed furring section to strengthen the connection. C) requires 6-in.-long stud material to strengthen the connection. D) requires no additional strengthening.
Scotch Marine boilers typically have a _____.Scotch Marine boilers typically have a _____.
a. low profile b. dry base c. vertical orientation d. cyclonic flame
When you are installing interior wood doors, it is important to remember that four hinges must be used when the door height is greater than _____.
a. 6-1/2 feet b. 7 feet c. 8 feet d. 9 feet
What is the purpose of locking out an electrical circuit?
A) To insure an electrical circuit cannot be energized B) To make sure the customer pays you C) To save on electricity bills D) To make sure an electrical circuit cannot be turned off