The first step when installing a postformed countertop is to ________

A) Make sure the base cabinets are level and ready for the countertop
B) Drill pilot holes in cabinets with wide rails and corners designed for screws and angle brackets
C) Set the countertop sections on the base cabinets in their final positions and check level
D) Check the fit of the countertop with the walls and scribe the backsplash if necessary


A

Trades & Technology

You might also like to view...

Identify the two types of profile geometric tolerance.

What will be an ideal response?

Trades & Technology

Describe the reference arrow method for sectional view identification.

What will be an ideal response?

Trades & Technology

If the suction pressure of a system is 60 psig and the oil pump outlet is 85 psig, what is the net oil pressure?

A. 60 psig B. 25 psig C. 85 psig D. 145 psig

Trades & Technology

ASE-Style Multiple Choice Which of the following is LEAST-Likely a component of a typical frame rack?

A. a ramp B. a pulling chain C. a hydraulic lift D. a datum plane

Trades & Technology