What is the time interval between scratch coat application and brown coat application?

What will be an ideal response?


The brown coat is applied as soon as the scratch coat has developed strength to hold the brown coat. It is typically
24 hours to 48 hours, depending on the weather. The colder the weather, the more time needed for the scratch coat
to gain strength.

Trades & Technology

You might also like to view...

Explain why an easement might be required prior to installing a wind turbine generating system.

What will be an ideal response?

Trades & Technology

Explain what to check if an output module LED illuminates but the device does not energize.

What will be an ideal response?

Trades & Technology

Roots will continue to grow after leaves become ____________________

Fill in the blank(s) with correct word

Trades & Technology

A _____ sample is a type of sample that allows the researcher to infer results back to the larger population

Fill in the blank(s) with correct word

Trades & Technology