To identify the location of a spring can support in the plant, use the _____.

a. specifications sheet
b. detail sheet
c. load table
d. series designation


b. detail sheet

Trades & Technology

You might also like to view...

The design of a ceiling in a large office building calls for a multilevel series of ceiling planes finished with gypsum board. The most likely method for attaching the ceiling to the structure is to

A) nail gypsum board directly to the wood light-frame structure. B) use lay-in acoustical tile. C) screw the gypsum board directly to a suspended metal framework.

Trades & Technology

How are future service connections handled when installing heat tracing on domestic water supply systems?

a. A junction box is installed at the end of the pipe. b. A service loop of extra heating cable is provided at connections. c. Additional heating cable is spliced in when additional services are added. d. The existing cable is replaced when new services are added.

Trades & Technology

What is the AGMA?

What will be an ideal response?

Trades & Technology

Prior to the fire investigator's arrival, firefighters should __________ any evidence found.

A. tag and photograph B. protect and preserve C. collect and package D. isolate and remove

Trades & Technology