Cuando se coordinan equipos con otros contratistas en el trabajo, el supervisor es responsable de elaborar un plan alternativo en caso de avería de equipos. Esta planificación se debe hacer en conjunto con los:
a. proveedores.
b. inspectores de la OSHA.
c. todos los integrantes de la cuadrilla.
d. la oficina central.
d. la oficina central.
You might also like to view...
Which type of engine-driven AC generator is commonly used as a standby system because they have a longer life and require less maintenance?
a. Diesel-powered b. LP gas-powered c. Liquid-cooled d. Air-cooled
Before attempting to install the transmission, be sure that the ____________________ is seated correctly on its pivot.
Fill in the blank(s) with the appropriate word(s).
Why does the air's relative humidity affect comfort?
What will be an ideal response?
The process of adjusting the stator flux position in relation to the rotor by a vector drive is called __________.
A. field adjustment B. step change C. vector change