The first drawing in a set of poured-in-place concrete plans is the____.
A. foundation plan
B. footing plan
C. base plan
D. structure plan
Answer: A
You might also like to view...
List various types of Portland cement and where they are typically specified.
What will be an ideal response?
El silicato de calcio/la perlita expandida se utilizan SOBRE TODO en:
a. trabajos a baja temperatura. b. sistemas de agua fría. c. tuberías subterráneas. d. sistemas de alta temperatura.
When a small change is to be made in the field which will result in a departure from the original plans and specifications, the owner/ engineer's resident project representative or inspector should do which of the following:
A. Issue a Change Order or Work Directive Change for each such change. B. Make an oral deal with the contractor, accumulating tradeoffs, so as to avoid paper work and allow the job to look good. C. Issue Change Orders or Work Directive Changes for major changes only, and issue only a Field Order for the small changes. D. Allow the contractor to unofficially make the change, as long as the quality of the work is acceptable.
The 8051 has
A) five 64-bit counter/timers and interrupt control for five interrupt sources. B) three 32-bit counter/timers and interrupt control for five interrupt sources. C) two 16-bit counter/timers and interrupt control for five interrupt sources. D) four 8-bit counter/timers and interrupt control for five interrupt sources.