Almost all commercial lines are white pigs.

Answer the following statement true (T) or false (F)


True

Trades & Technology

You might also like to view...

When making a conduit-to-box connection and a bonding wire will be installed, use a _____.

a. standard locknut b. sealing locknut c. grounding locknut d. plastic locknut

Trades & Technology

If one person is assigned all of the framing plans, s/he proceeds with preparing the ____ first.

A. endwall framing plan B. beam framing plan C. sheeting plan D. column framing plan

Trades & Technology

Blockout and metal connector sizes and locations needed in constructing floor/roof fabrication details are determined from the ____.

A. engineering calculation sketches B. framing plan C. shop drawings D. checkprints

Trades & Technology

The cross-section shown in the figure above is a commercial nosing designed for use with _____

a. steel-pan stairs b. concrete stairs c. sloped-riser steel-pan stairs d. wood stairs

Trades & Technology