The bottom ends of cross-bridging are not nailed in place until _____
a. the subfloor is installed
b. wall framing is erected
c. the building is closed in
d. approved by the inspector
a
You might also like to view...
____ is a form of site-cast concrete.
A. Lift-slab construction B. Tilt-up concrete construction C. Tilt-down concrete construction D. On-grade slab construction
CDE stands for Career Development Event
Indicate whether the statement is true or false
The term _____________________ cavity nesters refers to species that rely upon cavities created by other cavity nesters
Fill in the blank(s) with correct word
The necessary information for producing general-purpose metric screw threads is arranged in a standardized sequence in what is called a(n) ____.
A. ISO thread callout B. standard thread callout C. basic thread callout D. basic metric thread callout