The 2010 California Green Building Standards Code is a code with ________ requirements for new residential and nonresidential buildings

A) restrictive B) limiting C) optional D) mandatory


D

Trades & Technology

You might also like to view...

Which is likely to have the smaller setting, Grid or Snap? Why? What happens if the settings are reversed?

What will be an ideal response?

Trades & Technology

The B/C ratio for a mosquito control program pro­posed by the Harris County Department of Health is reported to be 2.1. The person who prepared the report stated that the annual health benefits were estimated to be $400,000, and that disbenefits of $25,000 per year were used in the calculation. He also stated that the costs for chemicals, machinery, maintenance, and labor were estimated at $150,000 per year, but he forgot to list the cost for initiating the program (trucks, pumps, tanks, etc.). If the ini­tial cost was amortized over a 10-year period at 8% per year, what is the estimated initial cost?

What will be an ideal response?

Trades & Technology

The first priority of a good preventive maintenance program is to focus on problems that cause ________

A) overhead costs B) environmental hazards C) safety concerns D) economic damage

Trades & Technology

The draft associated with forgings is found in the ____.

A. machining B. dies C. castings D. both a and b E. none of the above

Trades & Technology