The 2010 California Green Building Standards Code is a code with ________ requirements for new residential and nonresidential buildings

A) restrictive B) limiting C) optional D) mandatory


D

Trades & Technology

You might also like to view...

The B/C ratio for a mosquito control program pro­posed by the Harris County Department of Health is reported to be 2.1. The person who prepared the report stated that the annual health benefits were estimated to be $400,000, and that disbenefits of $25,000 per year were used in the calculation. He also stated that the costs for chemicals, machinery, maintenance, and labor were estimated at $150,000 per year, but he forgot to list the cost for initiating the program (trucks, pumps, tanks, etc.). If the ini­tial cost was amortized over a 10-year period at 8% per year, what is the estimated initial cost?

What will be an ideal response?

Trades & Technology

The first priority of a good preventive maintenance program is to focus on problems that cause ________

A) overhead costs B) environmental hazards C) safety concerns D) economic damage

Trades & Technology

The draft associated with forgings is found in the ____.

A. machining B. dies C. castings D. both a and b E. none of the above

Trades & Technology

Which is likely to have the smaller setting, Grid or Snap? Why? What happens if the settings are reversed?

What will be an ideal response?

Trades & Technology