Which of the following are methods of reducing manufacturing lead time?

I. subcontracting
II. forward scheduling
III. operation overlapping
IV. operation splitting

A) I, II, III and IV
B) III and IV
C) I and II
D) II and III
E) I and III


B

Trades & Technology

You might also like to view...

A waterway runs through your field. The waterway averages a 15-inch drop on the horizontal for each 450 feet. What is the slope of the waterway? (See Figure 6-1.)

Trades & Technology

The ISG is a singe phase AC motor.

Answer the following statement true (T) or false (F)

Trades & Technology

Why are project management skills important to apply in order to be effective?

What will be an ideal response?

Trades & Technology

The three types of loads a bearing must deal with are:

What will be an ideal response?

Trades & Technology