How would the primary control need to differ to accommodate power venting?

What will be an ideal response?


Power venting systems require that the furnace primary control allows for a delayed burner firing at startup. This allows the vent blower to come on and produce a draft before the burner firing sequence begins. The blower must also continue to run for a period of time after the burner shuts down to insure venting of all the combustion gases.

Trades & Technology

You might also like to view...

Modern agriculture could also be called:

a. industrialized agriculture b. conventional agriculture c. high-input agriculture d. All of the above are correct.

Trades & Technology

Common and halo blight affect which crop species?

a. corn c. sugar beets b. small grains d. beans

Trades & Technology

Are valves in a one-pipe system used for throttling steam to the unit? Why or why not?

What will be an ideal response?

Trades & Technology

600-V, dc shunt motor has armature and field resistance of 1.5 ? and 600 ?, respectively. When the motor runs unloaded, the line current is 3 A, and the speed is 1000 rpm. Calculate the developed torque at a full load armature current of 50 A.

What will be an ideal response?

Trades & Technology