____ are often used in precast concrete drafting to clarify isolated portions of a structure.

A. Incomplete sections
B. Partial sections
C. Fractional sections
D. Limited sections


Answer: B

Trades & Technology

You might also like to view...

In the 5G Option 3x network deployment, the UE responds to UE Capability Enquiry message with ____.

A. UE Capability Information message, with ue-CapabilityRAT-container for individual RATs toward an eNB B. a Random Access preamble transmitted to a gNB. C. a Random Access preamble transmitted to an eNB. D. UE Capability Information message, with ue-CapabilityRAT-container for individual RATs toward a gNB

Trades & Technology

The finished board covering the ends of the rafters is called the ____.

A. fascia B. soffit C. eve D. rake

Trades & Technology

____________________ (FTP) is an Internet protocol used for sending files.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A building is losing heat to the surrounding air. The inside walls of the building are maintained at 22.0°C, and the walls have a thermal conductivity of 0.50 W/m-K. The wall thickness is 0.10 m, and the outside wall temperature is held at 2.0°C. The air temperature is -10.0°C. Consider the emissivity of the outside of the walls to be 0.85. Calculate the conductive heat flux and the radiative heat flux. Considering that the heat flux entering the outside of the wall from the inside must balance the heat flux leaving the outside of the wall via convection and radiation, determine the necessary convective heat transfer coefficient of the air passing over the outside wall.

Given: To = Ts = 2°C = 275 K; Tsurr = -10°C = 263 K; Ti = 22.0°C = 295 K; ?x = 0.10 m; ? = 0.85; ? = 0.50 W/m-K What will be an ideal response?

Trades & Technology