The ____ for a pre-engineered metal building consists of the columns that are attached to the floor system by anchor bolts and the beams that are attached to the columns.

A. rigid frame
B. structural outline
C. column-beam support
D. skeleton structure


Answer: A

Trades & Technology

You might also like to view...

Manual rebar cutters can be used to cut rebar in diameters up to _____.

a. 2 inches b. 1-1/2 inches c. 1 inch d. 1/2 inch

Trades & Technology

The American Wire Gauge lists the largest wire as ____________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

____ is used to prevent water from running behind the siding.

A. Molding B. Elevation C. Cement D. Flashing

Trades & Technology

____ are slightly sloped passages that serve the same purpose as stairs in that they provide access from one elevation in a building to another.

A. Ramps B. Upgrades C. Inclines D. Gradients

Trades & Technology