____ are the parallel framing members that make up most of the floor framing.
A. Sill plates
B. Floor joists
C. Box sills
D. Sill sealers
Answer: B
Trades & Technology
You might also like to view...
You are making a 14" stub-up in 1" RMC and the bender deduct is listed as 10". Where do you make your first mark?
a. 1" from the end of the conduit b. 4" from the end of the conduit c. 5" from the end of the conduit d. 6" from the end of the conduit
Trades & Technology
What is the U-value of the assembly in Question 2? Does this value represent air-to-air heat transfer through the assembly? Explain.
What will be an ideal response?
Trades & Technology
Once the concrete is placed, it is allowed to partially cure approximately for _______days.
A. 7 B. 8 C. 10 D. 11
Trades & Technology
Power brakes are simply conventional brakes with an added power booster.
Answer the following statement true (T) or false (F)
Trades & Technology