The first step in the process of shutting down a skid-steer loader is to _____.

a. set the parking brake
b. lower the bucket so it is flat on the ground
c. cycle the hydraulic controls to release pressure
d. place the operator controls in neutral


Answer: B

Trades & Technology

You might also like to view...

The first step in assembling one or more intermediate lattice boom extensions on a telescoping-boom crane is to _____.

a. remove the swing-away from the main boom and place it on the ground b. insert the attach points of the intermediate section into the main boom head c. verify that the first intermediate section does not have a support roller d. have the auxiliary crane support the main boom while installing the intermediate section

Trades & Technology

If the _____ has dropped off and the bud appears to plump and of normal color, the bud has probably grown to the rootstock

A) Cotyledon B) Seeds C) Leaf petiole D) Leaves

Trades & Technology

Determine the forces in all truss bars. Indicate tension or compression.

Trades & Technology

Excessive runout can contribute to pedal ___________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology