Using the productivity from Problem 14, how many hours would it take to install 27 interior doors?

What will be an ideal response?


Using Formula 7-2 we get:

Labor hours = 27 doors × 1.29 lhr/door = 34.8 lhr

Trades & Technology

You might also like to view...

Before pulling a piston from a cylinder bore, which of the following is recommended?

A. remove the crankshaft B. pull piston through the bottom of the liner C. clean up the liner carbon ridge D. remove the main bearing cap

Trades & Technology

Simplify the expression:  36 - (M3 + M) + (M3- 12).

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

If a part has a taper of .010 in./ft. , the difference between two dial indicator readings 12 inches apart would be ________ inch

A) .005 in. B) .1125 inn. C) .101 in. D) .001 in.

Trades & Technology

The benefit of terminating a telephone with twisted pair is that the subscriber can change from the local incumbent to the cable TV provider without making any inside wire changes

Indicate whether the statement is true or false

Trades & Technology