The main goal of the design for manufacturability (DFM) procedure is to:
A. assign the workers to a particular job
B. consider the cost, time, and life of a product before production
C. determine the fastest way to manufacture a new product
D. arrange the manufacturing floor to achieve the best production cycle
Answer: B
You might also like to view...
One complete set of plans _____.
a. is made for all contractors to share b. is kept in the field office for reference c. must be on site at all times d. must be given to the building inspector
A PLC will treat all input and output sources the same; they will be looked upon as a ____.
A. signal B. voltage source C. resistance D. load
The volume of a cone is given by , where r is the radius of the base and h is the height. Assume the height is measured to be h = 6.00 ± 0.01 cm and the radius is r = 5.00 ± 0.02 cm.
a. Estimate the volume of the cone, and find the uncertainty in the estimate. b. Which would provide a greater reduction in the uncertainty in V: reducing the uncertainty in h to 0.005 cm or reducing the uncertainty in r to 0.01 cm?
What is static electricity and what hazards can it pose in a work setting?
What will be an ideal response?