Before beginning the design process, the landscape architect or designer should visit the project site to inventory and analyze its existing conditions

Indicate whether the statement is true or false


True

Trades & Technology

You might also like to view...

Is a good idea sufficient to ensure an entrepreneur's success?

Answer the following statement true (T) or false (F)

Trades & Technology

A complete set of construction documents contains:

A. drawings B. specifications size C. all of the above D. none of the above

Trades & Technology

In most cases, plasma arc cutting is _____

a. slower and less efficient than other cutting methods b. faster and more efficient than other cutting methods c. more likely to create large amounts of dross than other cutting methods d. more likely to create a large heat-affected zone than other cutting methods

Trades & Technology

A 10 Kw heating element, operating on rated 240 V, will have a Btu/h output of ____.

A. 29,319 B. 31,062 C. 34,130 D. 35,875