If the owner does not pay by the time required, what is the contractor entitled to do?
a. destroy the work c. borrow against the owner
b. stop work d. take ownership of the project
B
stop work
Trades & Technology
You might also like to view...
The minimum depth for a control joint is _____.
a. 3/8" b. 3/4" c. 1" d. 1-1/4"
Trades & Technology
One objective of a mastitis control program is the avoidance of _____ residue in the milk
a. feed c. protein b. drug d. bacteria
Trades & Technology
Explain when replacement by rerouting should not be considered for waste piping in specific use groups.
What will be an ideal response?
Trades & Technology
An advantage of photodiodes is that they can operate ____.
a. at very high frequencies b. at small intervals c. with no light d. at very low frequencies
Trades & Technology