A civil drafter spent the following amounts for equipment during the year:  $91.25, $93.34, $83.53, and $55.60. What is the average amount of money spent by the drafter?

What will be an ideal response?


$80.93

Trades & Technology

You might also like to view...

For safety, materials deliveries and crane availability should be scheduled with the _____.

a. supervising engineer b. general contractor c. architect's representative d. site safety officer

Trades & Technology

What is datum dimensioning?

What will be an ideal response?

Trades & Technology

For wiring in most HVAC equipment, connectors are applied using _____

a. low-temperature solder b. manual crimping tools c. hydraulic crimpers d. lineman's pliers

Trades & Technology

The circuit in Figure 12-3 is known as a ________ filter

A) band-pass B) low-pass C) notch D) high-pass

Trades & Technology