A raft type foundation _________________
A. requires friction pilings
B. requires hollow pilings that act as pontoons
C. must be mounted on bedrock
D. causes the building to float on top of the earth and are used when pilings would have to be excessively long in order to reach bedrock
D
You might also like to view...
New clay or shale brickwork should not be washed for _____ after brickwork is completed.
A. two weeks B. at least 7 days C. 72 hours D. 24 hours
?Which pipe welding position has the pipe held fixed horizontally?
A. ?1G B. ?2G C. ?5G D. ?6G
In the flux classification system, the letter "G" is used to indicate ____.
A. "shielding gas" B. "grade" C. an unspecified strength D. an unspecified classification
Technician A says that all piston pins are offset. Technician B says that offset piston pins increase friction. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician