In a schedule, _____ is the amount of time before you start affecting the project.
a. shared float
b. total float
c. free float
d. negative float
b. total float
You might also like to view...
Which of the following is a general safety tip that process technicians should follow?
A) Use the proper tool for the job B) Smoke anywhere in the facility C) Report injuries and incidents at the end of their shift D) Park in fire lanes
The ____, which is a running list on the right side of most of the school drawings, identifies all the material items in the building by a legend number.
A. material schedule B. material legend C. parts list D. parts schedule
What risks does a construction company assume by taking on an extremely large project, e.g., one that requires use of 60 percent of its resources?
What will be an ideal response?
According to Kirchhoff?s voltage law, the total voltage drop in a circuit is equal to the _____
A) voltage of the power source B) total resistance in the circuit C) current divided by resistance D) total current in the circuit