What are the last steps in developing a maintenance program?

What will be an ideal response?


Tracking maintenance results and implementing improvements are the final steps in developing a maintenance program.

Trades & Technology

You might also like to view...

The main components of a plate-style compactor are the _____.

a. boom and chain b. platform and base c. vibratory plate and engine bed d. fixed-mast and telescoping boom

Trades & Technology

If a 1157 bulb were installed in a left front parking light socket instead of a 2057 bulb, what would be the most likely result?

A) Left parking light would be slightly brighter. B) Left turn signal would flash faster. C) Left turn signal would flash slower. D) Left parking light would be slightly dimmer.

Trades & Technology

What is an example of a construction activity that is properly scheduled in terms of working days and calendar days?

What will be an ideal response?

Trades & Technology

The purpose of an integrator in a dual-slope ADC is to ________

A) generate the ramp voltages B) generate the sampling clock C) act as an anti-alias filter D) change the output from a sawtooth to rectangular output

Trades & Technology