____ means making an organization ready for possible contingencies that can escalate to become disasters.
A. Preparation
B. Mitigation of impact
C. War gaming
D. Crisis management
Answer: A
You might also like to view...
A dual-zone HVAC system allows the ________ to select different temperature settings.
A) Front seat and rear seat occupants B) Driver and passenger C) None of these D) Rear seat passengers in an SUV
The smoothest finish on a flange face is the _____.
a. concentric serrated b. phonographic serrated c. raised face d. coldwater finish
Answer the following statement(s) true (T) or false (F)
1. A motor starter is basically an electrically operated switch or solenoid with multiple contacts connected to it. 2. The overload relay is divided into three separate sections. 3. Schematic diagrams show components in their electrical sequence. 4. After the components on the schematic have been numbered, the next step is to place the same numbers on the corresponding components of the wiring diagram. 5. A motor starter is a contactor and an overload relay combined.
A manufacturing firm makes a production run of 3,750 pieces. Each piece is 78.30 millimeters long. The cost of material per meter of length is $2.40. Allowing 10% for waste and scrap, what is the material cost for the 3,750 pieces? Round to nearest dollar.
Fill in the blank(s) with the appropriate word(s).