In a port-helix injection system the period between port closure and NOP is described as?

A. Spill lag.
B. Ignition lag.
C. port closure lag.
D. Injection lag.


Answer: D

Trades & Technology

You might also like to view...

A vehicle has a worn steering part. The repair is covered under a warranty that the customer bought when he purchased the vehicle. Which warranty would likely pay for the repair?

A. “Bumper to bumper” new vehicle warranty B. Extended warranty C. Power train warranty D. Emission warranty

Trades & Technology

Predators are rarely a problem anymore for sheep producers

Indicate whether the statement is true or false.

Trades & Technology

Water supply pipes ____.

A. follow the least direct route to the main shutoff pump B. are not connected to the main shutoff valve C. do not emerge from the municipal water well D. follow the most direct route from the municipal water main

Trades & Technology

Drainage pipe comes in 200 ft long rolls. The number of rolls needed to construct a uniform buried drainage system for a nearly level 20 hectare field will depend primarily on:

A) the annual rainfall. B) rate of capillary movement in the soil. C) the texture and structure of the soil. D) the saturated moisture potential of the soil. E) the slope of the drain lines.

Trades & Technology