Drainage pipe comes in 200 ft long rolls. The number of rolls needed to construct a uniform buried drainage system for a nearly level 20 hectare field will depend primarily on:
A) the annual rainfall.
B) rate of capillary movement in the soil.
C) the texture and structure of the soil.
D) the saturated moisture potential of the soil.
E) the slope of the drain lines.
C
You might also like to view...
How are spot and seam welds similar?
What will be an ideal response?
Answer the following statements true (T) or false (F)
1. Not all cost or all benefits can be simply reduced to monetary terms, when calculating Return On Investment. 2. The decision-making process applies to all individuals, no matter what their position. 3. Money and/or ROI are the only factor to consider when a manager makes the final decision. 4. Things that are within your span of control are things you can directly affect and change.
The part that is MOST-Likely used to vary the fuel system to operate at the correct air-fuel ratio in closed loop is:
A. thermistor B. adaptive fuel trim C. resonator D. microprocessor
The development of the organs begins in the embryonic stage
Indicate whether the statement is true or false