Give an example of the sheet numbering system used when multiple sheets are required to display a single drawing, the sheet block organizes the multiple sheet drawing.
What will be an ideal response?
If there are two sheets needed to show a drawing, the first sheet is 1/1 or 1 OF 1 and the second sheet is 2/2 or 2 OF 2.
You might also like to view...
What tailpipe emission from a diesel engine is likely to increase under lean burn operation?
A. PM B. NOx C. VOCs D. CO
The proper brake bleeding sequence for a front/rear split hydraulic system is ________
A) Right front, right rear, left front, left rear B) Right rear, left front, right front, left rear C) Right rear, left rear, right front, left front D) Left front, left rear, right front, right rear
The safety professional's responsibility in the safety and health program is to do the necessary housekeeping chores everyday
Indicate whether the statement is true or false
________ is the finest (in terms of particle size) of the three soil textural classes
Fill in the blank(s) with correct word