A key objective of continuous improvement is _____.

a. execution of the schedule
b. streamlining tasks and procedures
c. measurement and analysis
d. satisfying stakeholders


d. satisfying stakeholders

Trades & Technology

You might also like to view...

Which of the following methods are used to change pump flow to match load in an operating system? Select all that apply.

A) Staging of multiple pumps. B) Variable-speed drive. C) Adjusting impeller size on the fly. D) Valves.

Trades & Technology

The "approval" box identifies who checked the competed drawing.

Answer the following statement true (T) or false (F)

Trades & Technology

A fuel pump was measured for current draw and amperage exceeded factory specifications. This can be caused by a ________

A) Defective fuel pump B) Clogged fuel filter C) Restricted fuel line D) Any of the above

Trades & Technology

The four types of driers that are used on a pneumatic system are ______________________________, ______________________________, ______________________________, and ______________________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology