Which of the following steps should be completed when returning a storage tank to service?

A. Open roof drains on external floating roof tanks.
B. Check to see that all manways are in place.
C. Inspect for leaks by hydrotesting the tank.
D. All of the above


A. Incorrect. All of the steps should be completed when returning a storage tank to service.
B. Incorrect. All of the steps should be completed when returning a storage tank to service.
C. Incorrect. All of the steps should be completed when returning a storage tank to service.
D. Correct. All of the steps should be completed when returning a storage tank to service.

Trades & Technology

You might also like to view...

What quality initiative is a collection of philosophies, concepts, methods, and tools used to manage quality?

A) ISO B) Six Sigma C) Total Productive Maintenance (TPM) D) Total Quality Management (TQM)

Trades & Technology

Answer the following statement(s) true (T) or false (F)

1. All PV systems are potentially dangerous from an installation and maintenance point of view. 2. With an AC module system, we do not calculate the system components as we would do with a standard system. 3. Any discernible electrical portion of an array can be considered a subpole. 4. In a string system, if one of the string inverters is out for service, the other inverter(s) will stay on line producing an output. 5. In an electrical system, fuses are used to protect the wiring and equipment from excessive pressure.

Trades & Technology

The nature of the recap breakdown depends on the type of work involved in the project and the type of contract the contractor will be entering into with the owner.

Answer the following statement true (T) or false (F)

Trades & Technology

Which of the following has the capacity range for a centrifugal compressor?

A) Commercial AC B) Residential AC C) Appliance D) Refrigeration

Trades & Technology