Computer analysis. The columns and girder of the indeterminate rigid frame in Figure P5.57a are fabricated from a W18 × 130 wide flange steel section: A = 38.2 in. 2 and I = 2460 in. 4 . The frame is to be designed for a uniform load of 4 kips/ft and a lateral wind load of 6 kips; use E = 29,000 kips/in. 2 . The weight of the girder is included in the 4 kips/ft uniform load. (a) Compute the reactions, plot the deflected shape, and draw the shear and moment curves for the columns and girder, using the computer program. (b) To avoid ponding* of rainwater on the roof, the girder is to be fabricated with a camber equal to the deflection at midspan of the roof girder produced by the uniform load. Determine the camber Figure P5.57.
Trades & Technology
You might also like to view...
Describe precast concrete columns and their formation with regard to precast concrete construction.
What will be an ideal response?
Trades & Technology
The ____ is responsible for tool security.
A. subcontractor B. foreman C. apprentice D. field engineer
Trades & Technology
When air enters a low-pressure system, it collects in the condenser because:
A) It is routed to the air collection accumulator. B) A small amount of air helps the system operate more efficiently. C) The air will not condense. D) The air falls to the bottom of the condenser shell.
Trades & Technology
If there are customer orders, the projected available is based on:
A) forecast demand. B) the greater of forecast demand and customer orders. C) the opinion of the planner. D) customer orders.