A trade breakdown is not detailed enough for the preliminary type of estimate prepared at the conception stage of a project.

Answer the following statement true (T) or false (F)


False

Trades & Technology

You might also like to view...

?When are air carbon arc cutting electrodes that connect normally required?

A. ?For overhead gouging to make the electrodes longer so you are out of the way of falling sparks. B. ?When gouging inside of a pipe or cylinder so the area being gouged can be reached. C. ?For track-type cutting operations. D. ?All of the above.

Trades & Technology

In structural steel drafting, ____,  sometimes referred to as erection drawings, include framing plans and sections.

A. symbolic structure drawings B. structural design drawings C. engineering blueprints D. engineering drawings

Trades & Technology

What commercial commodity became particularly favored by residents of towns and cities?

a. tableware b. wool garments c. cotton garments d. silk garments

Trades & Technology

Occupational health nurses are concerned with conserving the health of workers through:

A) Prevention, recognition, and treatment B) Supporting occupational physicians C) Prescribing methods to eliminate common stressors D) Diagnosis and treatment

Trades & Technology