What size bar stock is needed to make the Post Base Insert?

Review drawing number 523690C0A and then answer the question.


1-1/2?? Round x 1-1/4?? Long

Trades & Technology

You might also like to view...

Answer the following statements true (T) or false (F)

Linetypes need to be loaded, but colors do not.

Trades & Technology

Trace the growth, evolution, and decline of the Grange. What were the key developments involved in the success and decline of the Grange?

What will be an ideal response?

Trades & Technology

The amount of each board left exposed to the weather is called the ____ of the siding.

A. batten B. course C. exposure D. pattern

Trades & Technology

Before conducting a pre-incident survey and inspection for the purpose of prefire planning, the occupant should be notified in advance so:

A. the occupant can correct any fire hazards before the fire department arrives. B. there will be minimum inconvenience to the owner, occupant, and fire department. C. the owner can have fire extinguishers filled. D. someone will be at the location to fill out fire department forms.

Trades & Technology