Why is using a single plantwide predetermined overhead allocation rate not always accurate?

What will be an ideal response


Using a single plantwide predetermined overhead allocation rate is not always accurate because it is based on only one allocation base and uses that same allocation base to allocate overhead to all products. The allocation base selected might not accurately reflect the way products actually use a company's resources. There might not be a direct cause-and-effect relationship with overhead costs.

Business

You might also like to view...

Manufacturers can obtain greater control over the selling process by using a sales agency

Indicate whether the statement is true or false

Business

Tony thought the boss would not notice if he took a 2-hour lunch break when the work pace was slow. Tony was wrong. The boss was livid and reprimanded Tony in front of the entire team. As a result, Tony always makes sure he is back from his lunch break on time. What Tony experienced was _________

A. classical conditioning B. operant conditioning C. social learning D. positive reinforcement E. negative reinforcement

Business

Which of the following is a document required by the National Environmental Policy Act (NEPA) that must be prepared for any proposed legislation or major federal action that significantly affects the quality of the human environment?

A) environmental impact abstract B) environmental impact statement C) environmental impact design D) strategic environmental assessment

Business

A plausible way of building relationships with a large number of customers is to

A) place TV ads explaining how much the customers are valued. B) place welcoming ads on billboards near highways. C) interact with customers through blogs and social networking sites. D) make robot calls to their cell phones.

Business