During the erection of precast concrete curtain wall panels, the panels are leveled. The leveling of the panels is provided in the

A) panels' bearing supports.
B) panels' tieback connections.
C) A or B.
D) A and B.


A) panels' bearing supports.

Trades & Technology

You might also like to view...

Name (full version and its acronym) the U.S. organization that is recognized for rating windows for energy performance.

What will be an ideal response?

Trades & Technology

When conducting a visual inspection of the electrical system, what are some of the obvious problems that you should look out for?

What will be an ideal response?

Trades & Technology

Which of the following transformers provides no direct connection between the windings and the only connection is the magnetic flux lines of the core?

A. Power B. Isolation C. Voltage D. Current

Trades & Technology

How much power in watts is consumed to move a 30-pound sack 100 feet in 2 seconds?

What will be an ideal response?

Trades & Technology