To ensure a tight, waterproof seal on the ridge cap of a wood shingle roof, _____
A) use waterproof membrane or flashing over the ridge
B) alternately overlap the cap shingles
C) seal the ridge cap with roof cement
D) use multiple layers of shingles on the ridge cap
Answer: A
You might also like to view...
According to 694.30 (A) turbine output circuits over 30 volts that are installed in readily accessible locations systems must be installed in ____.
a. enclosures b. nacelles c. raceways d. housings
Describe a fertilizer program for a vineyard
What will be an ideal response?
How are volt meters connected to read the voltage drop across a load in a circuit?
A) One lead is connected to the load and the other lead is connected to ground. B) Voltmeters are connected in series with the load. C) Any connection to the circuit will give the same reading. D) Voltmeters are connected in parallel with the load.
You have pushed in the trailer supply valve. You should not move the tractor until the whole air system is:
a. Empty. b. Between 60 and 80 psi. c. At normal pressure.