Buildings with hydronic heating systems have shown ____ heating energy use compared to equivalent structures with forced-air heating systems.

a. higher
b. lower
c. equal
d. unquantifiable


b. lower

Trades & Technology

You might also like to view...

What methods are used to update the schedule and communicate the updates to those involved in the project?

What will be an ideal response?

Trades & Technology

On plan views, text is typically placed within the drawing, but arranged so that it does not interfere with any part of the drawing.

Answer the following statement true (T) or false (F)

Trades & Technology

Of what are the buried pipes usually made?

What will be an ideal response?

Trades & Technology

What diagnostic equipment is usually needed to diagnose faults or relearn the electric power steering system?

A) A breakout box B) Factory of factory-level scan tool C) Special electronic diagnostic equipment designed to test each specific system D) A 12-volt test light

Trades & Technology