The MPS is a vital link the production planning system because it:
I. keeps priorities valid.
II. forms the basis for determining the capacity needed.
III. is input to the material requirements plan.
IV. is input to the production plan.
A) I, II and IV only
B) I, II and III only
C) II, IIII and IV only
D) II, III and IV only
E) I, II, III and IV
B
You might also like to view...
When the sampling frequency fs = 20 kHz, the time required for a 10-bit staircase quantizer to make a comparison is T?=_____(x.xxx) ?s.
Fill in the blank(s) with the appropriate word(s).
While assembling a New Venture NV 242 transfer case the technician has two drive chains to choose from. Which one should the technician use?
A) The chain that two black link plates B) Either one, they are the same C) The smaller chain, which can run at higher speed D) The larger of the two
When the crane’s boom length or load radius falls between listed values on a load chart, the operator must _____.
a. select the next-shorter boom or load radius to determine crane capacity b. select the next-longer boom or load radius to determine crane capacity c. interpolate between the known capacity in proportion to the configuration value d. change the crane configuration to agree with the load chart's printed boom angle or load radius
An industrial robot that is depreciated by the MACRS method has B = $60,000 and a 5-year depreciable life. If the depreciation charge in year 3 is $8640, the salvage value that was used in the depreciation calculation is closest to: (dt values for years 1, 2, 3, 4, and 5 are 10.00%, 18.00%, 14.40%, 11.52%, and 9.22%, respectively.) (choose one)
(a) $0 (b) $10,000 (c) $20,000 (d) $30,000