If an owner decides that all bids that have been submitted for a project are too high, what may that owner do?

What will be an ideal response?


Typically the invitation for bids reserves the right to reject all bids. The
owner who wishes to go forward with the project advertises (normally after
first changing the design as to lower the expected cost) and the bidding
process is repeated.

Trades & Technology

You might also like to view...

Electrical nonmetallic tubing installed in club rooms of assembly occupancies must be concealed in walls, floors, and ceilings that provide a thermal barrier of material with a finish rating of at least _____.

a. 15 minutes b. 20 minutes c. 30 minutes d. 60 minutes

Trades & Technology

Answer the following statement(s) true (T) or false (F)

1. To the untrained eye, thickly made pigs are easier to discern. 2. A light-muscled, fat pig is widest at the top of the hams. 3. A market pig can be very muscular and still have too much fat. 4. The purpose of producing market hogs is to produce meat. 5. Structural correctness is unimportant in the selection of market animals. 6. A pig that has less than 0.6-inch of belly fat is considered unacceptable.

Trades & Technology

Pneumatic control systems

A) are the most recent type of commercial control B) Use air pressure to modulate control valves C) Have no moving parts D) Use electric motors to modulate control valves

Trades & Technology

Sunscreen used to protect against damage from the sun should be at least SPF __________.

What will be an ideal response?

Trades & Technology