Solve the following problem using the simplex method.A manufacturer makes three lines of tents, the Alpine, the Cub, and the Aspen. They are all made of the same material; the Alpine requires 30 square yards; the Cub, 15 square yards; and the Aspen, 60 square yards. The manufacturing cost of the Alpine is $36, the Cub $24, and the Aspen $32. The material is available in amounts of 8400 square yards weekly, and the weekly working budget of the company is $7680. If the profit is $8 on each Alpine, $4 on each Cub, and $12 on each Aspen, what should the weekly production schedule be to maximize total profit?

What will be an ideal response?


Maximum profit = $2,000 when 160 Alpine, no Cub, and 60 Aspen are produced.

Mathematics

You might also like to view...

A delivery truck must deliver packages to five different store locations (A, B, C, D, and E). The trip must start and end at D. The graph below shows the distances (in miles) between locations. We want to minimize the total distance traveled. The nearest-neighbor tour starting with vertex D is given by:

A. D, C, A, B, E, D. B. D, B, E, C, A, D. C. D, A, B, E, C, D. D. D, E, A, B, C, D. E. none of these

Mathematics

Graph the function.f(x) = log5(x - 3)

A.

B.

C.

D.

Mathematics

Graph the function.y =  - 3

A.

B.

C.

D.

Mathematics

Use a cubic or quartic regression (as specified) to fit a curve through the points given in the table. Round to the nearest hundredth.  (Quartic)

A. y ? -0.01x4 - 0.27x3 + 1.94x2 + 5.70x - 1.00 B. y ? 0.01x4 + 0.22x3 - 1.94x2 - 5.72x - 1.00 C. y ? -0.01x4 + 0.27x3 - 1.94x2 + 5.70x - 1.00 D. y ? -0.02x4 + 0.22x3 + 1.96x2 - 5.72x - 1.00

Mathematics