When will representatives of the Authority Having Jurisdiction (AHJ) inspect the PV system?
What will be an ideal response?
Representatives of the AHJ will inspect the system once it has been installed, and often at different times during the installation process.
You might also like to view...
Identification of dairy animals includes ear tags, ear badges, neck chains, and tattoos
Indicate whether the statement is true or false.
Which wire on a TP sensor should be back probed to check for a voltage signal to the PCM?
A) Ground wire
B) Meter should be connected between 5-volt reference and ground
C) 5-volt reference (Vref)
D) Signal wire
The LEED program standards are developed by:
A) NHAB - National Association of Home Builders. B) EPA - Environmental Protection Agency. C) USGBC - United States Green Building Council. D) DOE - Department of Energy.
The curve on a cam displacement diagram represents the face of the cam.
Answer the following statement true (T) or false (F)