Improvement Project Teams (IPTs) are ad hoc teams formed by the TSM Steering Committee
Indicate whether the statement is true or false
T
You might also like to view...
A five-speed transmission is in second gear. Which is correct?
A) The 1-2 synchronizer is moved so that the sleeve has engaged the clutching teeth of second gear B) The power flow is from the input shaft gear to the cluster gear then to the second speed gear on the main shaft assembly C) Both A and B D) Neither A nor B
Technician A says the first step in checking transmission electrical controls is to verify system voltage. Technician B says when no DTCs are present then diagnose the transmission based on its symptoms. Who is correct?
A. A only B. B only C. Both A and B D. Neither A nor B
The geometric tolerancing symbol that is placed in the first compartment of the feature control frame is called:
a. geometric tolerancing symbol b. geometric characteristic symbol c. feature control symbol d. geometric dimensioning symbol
A(n) ____ grille in the room receives the air and channels it into a duct that carries it to the roof, where a fan exhausts it to the outside.
A. exhaust B. unit C. ventilated D. louvered