In a set of blueprints, the drawing scale, name of the building project, the name of the architectural firm, and the date of completion are found in the _________________________.
Fill in the blank(s) with the appropriate word(s).
title block
Trades & Technology
You might also like to view...
Describe what has changed in the creation and distribution of engineering drawings in the past 30 years.
What will be an ideal response?
Trades & Technology
A __________ device operates by monitoring the current flow on both the ungrounded “hot” conductor and the grounded conductor.
a. TVSS b. circuit breaker c. fuse d. GFCI
Trades & Technology
Where is an accumulator normally installed?
a. Suction line b. Liquid line c. Discharge line d. Condensate line
Trades & Technology
Discuss the differences between blister packaging and skin packaging
What will be an ideal response?
Trades & Technology