List five items that should be a part of a lockout-tagout procedure._________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

What will be an ideal response?


Planning
Notification of all affected and authorized persons
Shut down equipment
Removal of all energy sources
Application of locks and tags
Verification of equipment isolation and absence of all energy sources
If applicable, ground all conductors

Trades & Technology

You might also like to view...

The CFS framing for an exterior non-load-bearing wall used as backup for exterior cladding can either be a bypass framing or an infill framing. The bypass framing can be used for

A) up to a one -story building. B) up to a two-story building. C) up to a three-story building. D) up to a four-story building. E) up to any number of stories.

Trades & Technology

Irradiation is also known as ____________________ pasteurization

Fill in the blank(s) with correct word

Trades & Technology

What is the main requirement for the water used in Portland cement?

What will be an ideal response?

Trades & Technology

Electrical controls such as switches ___________

A) May be on either the positive or ground side of the circuit B) Control electrical flow in the circuit C) Both A and B D) Neither A nor B

Trades & Technology