Computer study of a cable-stayed bridge. The deck and tower making up the two-span, cable-stayed bridge in Figure P6.16 are constructed of reinforced concrete. The cross section of the bridge is constant with an area of 15 ft 2 and a moment of inertia of 19 ft4. The dead weight of the girders is 4 kips/ft. In addition the girders are to be designed to support a live load of 0.6 kips/ft that is to be positioned to maximize the design forces in individual members. The vertical cable tower, located at the center support, has a cross-sectional area of 24 ft2 and a moment of inertia of 128 ft 4 . Four cables, each with an area of 13 in. 2 and an effective modulus of elasticity of 26,000 kips/in. 2 , are used to support the deck at the third points of each 120 ft span. The modulus of elasticity
of the concrete is 5000 kips/in. 2 . The cable reaction may be assumed to be applied to the underside of the roadway. Members have been detailed such that the support at D acts as a simple support for both the tower and the roadway girders.
(a) Analyze the structure for full live and dead loads on both spans, that is, establish the shear, moment, and axial load diagrams for the girders, the forces in the cables, and the maximum deflection of the girders.
(b) With the dead load on both spans and the live load on the left span ABCD, determine the shear, moment, and axial load diagrams for both spans, the axial force in the cables, and the shear, moment, and axial load in the vertical cable tower. Also determine the lateral deflection of the cable tower.
You might also like to view...
Technician A says multi-layered steel gaskets have from eight to ten layers. Technician B says when drilling steel, you use a cutting oil. Who is right?
A. Technician A B. Technician B C. Both technicians D. Neither technician
Describe the term “process out of control.”
What will be an ideal response?
Which term describes the PCM shutting off fuel injection when the accelerator is pressed all the way down?
A) Open loop mode B) Starting mode C) Clear flood mode D) Closed loop mode
What are some of the inherent advantages and disadvantages in measuring project duration in calendar days? Working days?
What will be an ideal response?