Maintenance activities within the hub assembly may include activation or verification of the emergency pitch system.

Answer the following statement true (T) or false (F)


True

Testing of battery packs or operational checks of hydraulic accumulators located within the hub may be necessary during a PM activity.

Trades & Technology

You might also like to view...

Discuss why an industrial plant might choose to install a three-phase motor rather than a single-phase motor.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

List five domestic uses of water

What will be an ideal response?

Trades & Technology

What are the signs of Dippity Pig syndrome?

What will be an ideal response?

Trades & Technology

Refer to the figure. If L is measured with a ruler at 2.5", what is the length of the pipe?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology