A testing engineer in a light bulb factory is planning a study to estimate the average life of a large shipment of light bulbs. The engineer wants to estimate the average life within plus or minus 16 hours with 95 percent confidence. Assuming a process standard deviation of 90 hours, determine the sample size for this study

a. 7
b. 43
c. 58
d. 122


d

Business

You might also like to view...

Putting the key issues at the beginning in an agenda is advantageous.

Answer the following statement true (T) or false (F)

Business

The staff training center at a large regional hospital provides training sessions in CPR to all employees. Assume that the capacity of this training system was designed to be 1200 employees per year

Since the training center was first put into use, the program has become more complex, so that 1050 now represents the most employees that can be trained per year. In the past year, 950 employees were trained. The efficiency of this system is approximately ________ and its utilization is approximately ________. A) 79.2 percent; 90.5 percent B) 90.5 percent; 79.2 percent C) 87.5 percent; 950 employees D) 950 employees; 1050 employees E) 110.5 percent; 114.3 percent

Business

Flo's Flowers' current ratio is 1.3. The industry average for the current ratio is 1.2. This indicates that Flo's can cover its short term liabilities with its short term assets.

Answer the following statement true (T) or false (F)

Business

Manufacturers rarely emphasize packaging because this aspect of the product has little relevance to a customer's decision-making process.

Answer the following statement true (T) or false (F)

Business