What identifying notations must be included on a bid?

a. client's name and address c. date of preparation
b. name of the estimator d. All answers are correct


D
All answers are correct

Trades & Technology

You might also like to view...

What is premises liability law and what is its role in construction site accidents?

What will be an ideal response?

Trades & Technology

A rapidly growing city is dedicated to neighborhood integrity. However, increasing traffic and speed on a through street are of concern to residents. The city manager has proposed five independent traffic-calming options:

1. Stop sign at corner A 2. Stop sign at corner B 3. Low-profile speed bump at point C 4. Low-profile speed bump at point D 5. Speed dip at point E There cannot be any of the following combinations in the final projects: —No combination of dip and one or two bumps —Not two bumps —Not two stop signs (a) If there were no restrictions on how the op­tions can be combined, calculate how many alternatives there are to evaluate. (b) Using the restrictions, identify the number of and list of acceptable alternatives.

Trades & Technology

The two best known national green certification programs are _________.

A. LEED and NAHB B. Green Globes and Green Guard C. Energy Star and Green Key D. Green Seal and Mexico Regulation

Trades & Technology

The fitting at the end of a round duct that connects the duct to the floor register is called a(n) ____.

A. end boot B. reducer C. take off D. stack head

Trades & Technology