In one month, a technician woks 37 hours, 41 hours, 39 hours, and 43 hours. What is the total number of hours the technician works?
Fill in the blank(s) with the appropriate word(s).
160
Trades & Technology
You might also like to view...
One of the requirements of most contract documents is that the contractor visits the site. Why is the site investigation important?
What will be an ideal response?
Trades & Technology
An ampacity adjustment of conductors in cable tray is more likely to be required when installing _____.
a. single-conductor cable b. conductors in ventilated tray c. 600V systems d. multiconductor cable
Trades & Technology
Where is the proper water level in a water tube boiler controlled?
A) Mud drum B) Steam drum C) Risers D) Downcomers
Trades & Technology
Explain how off-shore drilling methods differ from land drilling methods
What will be an ideal response?